Applied Remedial Technologies, Inc.
|
| |
|
Chlorinated Solvent Remediation
- Provided principle oversight of the LA Landfill ground water remediation project in Albuquerque, New Mexico. Project entailed engineering design and construction management of the groundwater pump and treatment system for chlorinated volatile organic contaminants.
- Project manager for a SBIR Grant with the University of Arizona to evaluate an innovative catalytic oxidation/reduction vapor treatment system. Provided engineering design and construction of the pilot scale treatment system utilizing a catalyst in combination with the addition of a reductant.
- Project manager of a chlorinated hydrocarbon site for the Salt River Project in Phoenix. Performed Soil Vapor Extraction and sparging pilot testing. Designed and constructed full scale soil remediation system.
- Provided remedial investigation oversight and supervision of the closed Silverbell municipal solid waste landfill in Tucson, Arizona for a large tetrachloroethylene groundwater plume. Project included design, installation and monitoring of groundwater and vapor monitoring systems; and engineering design, construction and operation of a soil vapor extraction system.
- Construction manager for Zero Corporation to install a multi well, Soil Vapor Extraction/groundwater sparging system in Burbank, California. Project included equipment design, permitting, and construction of a 700 standard cubic feet per minute, 8,000 lb granular activated carbon vapor treatment system.
- Project manager of the Solvent Savers Superfund site in Linklaen, New York. Project involved preparation of Remedial Design Work Plan and implementation of large scale in situ and ex situ Soil Vapor Extraction technologies for chlorinated and aromatic hydrocarbons.
- Project manager for large scale site characterization at the former BASF facility in Anaheim, California. Project entailed soil gas sampling, soil sampling, installation of groundwater monitoring wells, and groundwater sampling and analysis. Evaluated the potential presence of heavy metals, volatile organics, semi volatile organics, and PCB's.
- Project manager for a soil remediation project in City of Industry, California for United Technologies. Designed remediation system and predicted contaminant removal efficiencies for chlorinated volatile organics. Provided construction management of a multiple extraction/injection well Soil Vapor Extraction system with automatic data acquisition. Supervised full scale operation and maintenance system.
|
|